Page 1 of 5

A414 Corridor Consultation

Posted: Fri 16 Nov, 2018 3:33 pm
by Steve
The County Council are holding a three month public consultation on improvements to the A414 corridor, including a Hertford bypass.

https://www.hertford.net/local-news/index.php?id=108

Links to the summary and detailed consultation documents here:

https://www.hertford.net/pdf/a414_consu ... ummary.pdf
(8 pages)

https://www.hertford.net/pdf/a414_consu ... detail.pdf
(360 pages)

Re: A414 Corridor Consultation

Posted: Sat 17 Nov, 2018 9:31 am
by monkeyman1974
very interesting, although its not yet clear how the consultation shall take place

the by-pass appears to be a core strategy


the 'old' a414 will then be downgraded to potentially single carraigeway, with the space capacity allocated to a bus/coach/tram arrangement. If it works, great, but worry is this just reinforces rat-running

Re: A414 Corridor Consultation

Posted: Sat 17 Nov, 2018 7:40 pm
by TcfL
Very interested in the survey as my recollection is that LTP4 spoke of 87,000 homes being needed by 2031 and now we have leapt to 50,000 along A414 plus 80,000?

Re: A414 Corridor Consultation

Posted: Sat 17 Nov, 2018 7:58 pm
by jbond
EHDC Infrastructure delivery plan for the District Plan. https://www.eastherts.gov.uk/IDM

Transport Hertford Strategic Solution HCC £155,000,000 -£175,000,00
By 2024
Unfunded There is currently no funding agreed for this scheme.
This is most likely to be in the form of a bypass.

Here's the route as proposed in 1994. Yes it's been going on that long.
Image See if you can work out how many expensive houses lie on the route. Among others it looks like it goes right through the Foxholes and Dawlicious farms.

Don't hold your breath.

Re: A414 Corridor Consultation

Posted: Sun 18 Nov, 2018 8:50 pm
by monkeyman1974
TcfL wrote:
Sat 17 Nov, 2018 7:40 pm
Very interested in the survey as my recollection is that LTP4 spoke of 87,000 homes being needed by 2031 and now we have leapt to 50,000 along A414 plus 80,000?
this site is very useful

https://www.hertfordshire.gov.uk/micros ... ation.aspx

east herts 18.9% increase by 2041

we need a by-pass

Re: A414 Corridor Consultation

Posted: Mon 19 Nov, 2018 10:34 am
by TcfL
Thanks for that - it is interesting and quite easy to read. Must say that (whilst not read in detail) the first fact that hit me was that Herts population density at mid-2017 (per hectare) was 7.19 against East of England 3.23 and England 4.27. Not sure building more roads and reducing the green spaces (which will also be being lost to housing) is going to solve anything but just create gridlock, more stress and loss of quality of life.

Re: A414 Corridor Consultation

Posted: Mon 03 Dec, 2018 9:32 am
by jbond
Is there any sign of where to post comments about the draft document? Has the consultation actually started?

I'm thinking that affected Town and Parish Councils ought to be providing official responses. But where?

Re: A414 Corridor Consultation

Posted: Mon 03 Dec, 2018 1:58 pm
by Steve
jbond wrote:
Mon 03 Dec, 2018 9:32 am
Is there any sign of where to post comments about the draft document? Has the consultation actually started?

I'm thinking that affected Town and Parish Councils ought to be providing official responses. But where?
The consultation has yet to be formally announced or opened.

It was approved by the council on the 14th November. I'm not sure how long it takes to be the materials and structure to be organised but I imagine something will be available soon.

Re: A414 Corridor Consultation

Posted: Mon 03 Dec, 2018 2:38 pm
by jbond
And there it is. It apparently runs till 8 June 2019.
https://www.hertfordshire.gov.uk/about- ... ation.aspx

Re: A414 Corridor Consultation

Posted: Mon 03 Dec, 2018 4:56 pm
by codek2
runs until 25th feb 2019.