Discover Hertford Online Forum

Archived Topic

Topic ID 5104

22/02/2010 by thefair1973

A414 roadworks

There's a sign up on the A414 stating roadworks commence from 15th March for 21 weeks. Anybody know what they're actually doing? It seems to be the stretch from Gates garage to Which? heading to Hatfield


0 replies

Archived Replies

Reply ID 72182

22/02/2010 by Woody

There's a similar sign posted in the other direction too, just by the roundabout as Gascoyne Way becomes a dual-carriageway. It made me take a look at the road surface, which is terribly pitted and in need of re-laying. Though, that would not take 5 months - would it? I can only assume that the bridge is in need of repair, similar to the work completed near Hertingfordbury. Unless, of course, it is either the eagerly awaited Hertford Tunnel about to be dug or piles being driven for the Hertford Monorail.


Reply ID 72222

24/02/2010 by Steve

Bridge repairs.


Reply ID 72260

26/02/2010 by Steve

http://www.hertford.net/blog/default.asp?id=715


Reply ID 72522

10/03/2010 by codek2

The good news about this, is that it'll be maintained as 2 lanes in both directions during peak hours, so there should be no impact from the work at those times: http://news.hertsdirect.org/Release.aspx?id=9508


Reply ID 72523

10/03/2010 by Steve

quote:
Originally posted by codek2
The good news about this, is that it'll be maintained as 2 lanes in both directions during peak hours, so there should be no impact from the work at those times: http://news.hertsdirect.org/Release.aspx?id=9508
The guy who's running the project uses the road to get to work (seriously)


Reply ID 72535

10/03/2010 by codek2

that is very good news.


6 replies